ADU Construction in Los Angeles

Custom accessory dwelling units across Los Angeles, built by an Encino-based team with 30+ years of experience. Detached units, garage conversions, and attached additions, handled from design and permits through final inspection.

Recent ADU Projects

An ADU is a full build, not a remodel: foundation, framing, plumbing, electrical, and its own kitchen and bath, all under a permit process that’s changed a lot in recent years. H&O handles the whole thing, from city approval to keys in hand, so you get a rentable, livable unit without managing five different contractors.

ADU Kitchen
ADU Bathroom East Los Angeles
ADU kitchen with white shaker cabinets, quartz countertops, double wall oven, and gray tile floor

ADU Construction, From Permits to Move-In

Most ADU projects stall in the same two places: the permit process and coordinating trades that have never worked together. H&O runs both. We handle site planning, city submittals, and inspections, then build the unit with the same crew that does our kitchens and baths, so the finish quality inside matches a full home remodel.

What We Build

What to Expect From Your ADU Build with H&O

Free Consultation

We walk your property, check setbacks, utility access, and lot conditions, and give you a realistic read on what can be built and what it will take.

Design & Planning

Floor plan, exterior design, and finish selections, with a full estimate and a permit timeline before anything is submitted to the city.

Permits & Preparation

We prepare the plans, handle city submittals and corrections, and schedule utility work and site prep so construction starts as soon as approval lands.

Build & Walkthrough

Foundation through final inspection, including kitchen and bath installation, with a punch-list walkthrough before we hand over the keys.

Frequently Asked Questions

How long does it take to build an ADU?

Once permits are approved, building an ADU in Los Angeles typically takes 2 to 4 months. Permit approval varies by city and is outside our control, so we plan that timeline separately. We walk you through the schedule before construction starts and keep you updated along the way.

Yes. Every ADU requires city approval, but California law now limits how much cities can restrict them, so most properties qualify. We handle the plans, submittals, and any corrections the city requests.

Yes. Garage conversions are one of the most cost-effective ways to add a unit. We handle the structural updates, insulation, plumbing and electrical, and the new kitchen and bath, and coordinate replacement parking if your city requires it.

Yes. To be a legal ADU, the unit must have its own kitchen, bathroom, and separate entrance. That’s where H&O’s remodeling background pays off: the interiors are finished to the same standard as our kitchen and bathroom projects.

Get a Free Estimate

Ready to get started? Give us a call at (818) 822-2904 for a free estimate, or fill out the form below and our team will get back to you shortly.